welcome,guest
TitleProduct

First Generation Lean Tube

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2022-08-27 15:19

  • Browse the number:

    423

Send an inquiries

Company Profile

Shenzhen Jinhaiyuan Industrial Equipment Co., Ltd.

By certification [File Integrity]

Contact: leanpipefittings(Mr.)  

Email:

Telephone:

Phone:

Area: Guangdong

Address: Guangdong

Website: http://www.leanpipefittings.com/ http://leanpipefittings.xmkacen.com/

Product details

1. The color of the lean pipe is various, and customers can choose the color of the wire rod according to their own needs.

2.lean pipe products can effectively solve the problem of capital investment.

3. Have a durable and flexible system.

Name

lean pipe

Size

0.8-2.0mm

Main ingredient

Steel alloy and polymer plastic

Color

Beige, pure white

Function

Anti-corrosion wear, anti-rust,etc

Feature

Environmental protection, simple, low cost

Usage

Turnover carts, storage shelves


4. The steel pipe inside the lean pipe is coated with anti-rust agent, which effectively prolongs the service life.

*Standardization: in line with ISO9000 and QS9000 requirements,

*Flexibility: building block combination structure, easy to reorganize.

* Environmental protection: pollution-free production, the components are completely recyclable.

*Ergonomic: only one M6 Allen key is required.


Application

Lean production lines, woodworking equipment, machinery manufacturing, chemical products, pharmaceutical production, farms, Sekisui, etc. Provide equipment suitable for industrial production, wire production lines, equipment automation, and production lines suitable for industrial equipment, equipment automation, and design equipment suitable for different regions and technical services.


Lean pipe assembly steps

Install the side piece and the bottom piece first, then install the connecting rod, install the load-bearing rod first, then install the connecting rod, install the two ends first, and then install the middle. All chucks and plastic pipes are installed in place according to the design requirements. When hitting the plastic pipe and the collet to install the column with a hard hammer, make sure that it is perpendicular to the ground, so as to avoid uneven force on the entire wire rod frame and cause damage. Note: When cutting the plastic-coated pipe, pay attention to the cutting deformation of the plastic pipe. There may be special-purpose components, such as inserting Frames, hooks, etc., need to be processed and configured.



http://www.leanpipefittings.com/